Discover how a bimodal integration strategy can address the major data management challenges facing your organization today.
Get the Report →The Microsoft Project ODBC Driver is a powerful tool that allows you to connect with live Microsoft Project data, directly from any applications that support ODBC connectivity. Access Tasks, Issues, Projects, Deliverables, etc. like you would a database - read, write, and update MS Project through a standard ODBC Driver interface.
Features
- Fully compatible with Microsoft Project Web Apps and Microsoft Project on Office 365
- SQL-like access to your MS Project data, including custom fields
- Powerful metadata querying enables SQL-like access to non-database sources
- Push down query optimization pushes SQL operations down to the server whenever possible, increasing performance
- Client-side query execution engine, supports SQL-92 operations that are not available server-side
- Connect to live Microsoft Project data, for real-time data access
- Full support for data aggregation and complex JOINs in SQL queries
- Secure connectivity through modern cryptography, including TLS 1.2, SHA-256, ECC, etc.
- Seamless integration with leading BI, reporting, and ETL tools and with custom applications
Specifications
- Supports 32-bit and 64-bit applications.
- ODBC 3.8 compliant native protocol based drivers.
- Comprehensive ANSI SQL-92 support.
- Full Unicode Support - any language, any data.
- Cross-platform ODBC. Available for Windows, Linux and macOS.
Robust ODBC Access to Microsoft Project
Full-featured and consistent SQL access to any supported data source through ODBC
-
Standards-Compliant ODBC
ODBC 3.8 compliant native protocol based drivers.
-
Unicode, 32-bit and 64-bit support
Support 32-bit and 64-bit applications and unicode ODBC APIs.
-
Cross-platform ODBC (Windows/Linux/Mac)
Available for Microsoft Windows, Unix, and Mac (macOS / OS X) platforms.
-
Certified ODBC Compatibility*
Our drivers undergo extensive testing and are certified to be compatible with leading analytics and reporting applications like Tableau, Microsoft Excel, and many more.
* Please visit our knowledge base to access how-to articles. -
Embedded Remoting Capabilities
Our exclusive Remoting feature allows hosting the ODBC connection on a server to enable connections from various clients on any platform (Java, .NET, C++, PHP, Python, etc.), using any standards based technology (ODBC, JDBC, etc.). ODBC Remoting is enabled using the popular MySQL and SQL (TDS) wire protocol server.
-
String, Date, Numeric SQL Functions
The driver includes a library of 50 plus functions that can manipulate column values into the desired result. Popular examples include Regex, JSON, and XML processing functions.
-
Collaborative Query Processing
Our drivers enhance the data source's capabilities by additional client-side processing, when needed, to enable analytic summaries of data such as SUM, AVG, MAX, MIN, etc.
-
Easily Customizable and Configurable
The data model exposed by our ODBC Drivers can easily be customized to add or remove tables/columns, change data types, etc. without requiring a new build. These customizations are supported at runtime using human-readable schema files that are easy to edit.
-
Enterprise-class Secure Connectivity
Includes standard Enterprise-class security features such as TLS/ SSL data encryption for all client-server communications.
-
Replication and Caching
Our replication and caching commands make it easy to copy data to local and cloud data stores such as Oracle, SQL Server, Google Cloud SQL, etc. The replication commands include many features that allow for intelligent incremental updates to cached data.
Enterprise-Class Remoting
MySQL/SQL Database entry points for Microsoft Project Data
The CData ODBC drivers include powerful fully-integrated remote access capabilities that makes Microsoft Project data accessible from virtually anywhere. The drivers include the CData SQL Gateway, which can the optional ability to accept incoming SQL and MySQL client connections and service standard database requests.
With the CData SQL Gateway, users can interact with Microsoft Project data from any client that supports SQL Server or MySQL: from Web & mobile applications, to CRM and CMS systems, BI tools like SQL Server Analysis Services, and even through popular management applications like MySQL Workbench. Access Microsoft Project data from virtually any application that can access external data. Applications that can access SQL Server or MySQL data can now connect to Microsoft Project with this driver.
- Connect Microsoft Project data with popular BI tools like SQL Server Analysis Services.
- Enable enterprise Microsoft Project data integration through SQL Linked Server connectivity
- Includes support for the MySQL and SQL (TDS) remote access protocols, with advanced wire-protocol SSL security - industry standards for remote database connectivity.
- Easily connect to Microsoft Project from code (PHP, Python, Ruby, Objective-C, etc.) using one of the standard client libraries for accessing SQL/MySQL.
- * Available exclusively in ODBC Server Licenses.
learn more