Discover how a bimodal integration strategy can address the major data management challenges facing your organization today.
Get the Report →ETL Microsoft Project in Oracle Data Integrator
This article shows how to transfer Microsoft Project data into a data warehouse using Oracle Data Integrator.
Leverage existing skills by using the JDBC standard to read and write to Microsoft Project: Through drop-in integration into ETL tools like Oracle Data Integrator (ODI), the CData JDBC Driver for Microsoft Project connects real-time Microsoft Project data to your data warehouse, business intelligence, and Big Data technologies.
JDBC connectivity enables you to work with Microsoft Project just as you would any other database in ODI. As with an RDBMS, you can use the driver to connect directly to the Microsoft Project APIs in real time instead of working with flat files.
This article walks through a JDBC-based ETL -- Microsoft Project to Oracle. After reverse engineering a data model of Microsoft Project entities, you will create a mapping and select a data loading strategy -- since the driver supports SQL-92, this last step can easily be accomplished by selecting the built-in SQL to SQL Loading Knowledge Module.
Install the Driver
To install the driver, copy the driver JAR (cdata.jdbc.microsoftproject.jar) and .lic file (cdata.jdbc.microsoftproject.lic), located in the installation folder, into the ODI appropriate directory:
- UNIX/Linux without Agent: ~/.odi/oracledi/userlib
- UNIX/Linux with Agent: ~/.odi/oracledi/userlib and $ODI_HOME/odi/agent/lib
- Windows without Agent: %APPDATA%\Roaming\odi\oracledi\userlib
- Windows with Agent: %APPDATA%\odi\oracledi\userlib and %APPDATA%\odi\agent\lib
Restart ODI to complete the installation.
Reverse Engineer a Model
Reverse engineering the model retrieves metadata about the driver's relational view of Microsoft Project data. After reverse engineering, you can query real-time Microsoft Project data and create mappings based on Microsoft Project tables.
- In ODI, connect to your repository and click New -> Model and Topology Objects.
- On the Model screen of the resulting dialog, enter the following information:
- Name: Enter MicrosoftProject.
- Technology: Select Generic SQL (for ODI Version 12.2+, select Microsoft SQL Server).
- Logical Schema: Enter MicrosoftProject.
- Context: Select Global.
- On the Data Server screen of the resulting dialog, enter the following information:
- Name: Enter MicrosoftProject.
- Driver List: Select Oracle JDBC Driver.
- Driver: Enter cdata.jdbc.microsoftproject.MicrosoftProjectDriver
- URL: Enter the JDBC URL containing the connection string.
The User and Password properties, under the Authentication section, must be set to valid Microsoft Project user credentials. In addition, you will need to specify a URL to a valid Microsoft Project server organization root or Microsoft Project services file.
Built-in Connection String Designer
For assistance in constructing the JDBC URL, use the connection string designer built into the Microsoft Project JDBC Driver. Either double-click the JAR file or execute the jar file from the command-line.
java -jar cdata.jdbc.microsoftproject.jar
Fill in the connection properties and copy the connection string to the clipboard.
Below is a typical connection string:
jdbc:microsoftproject:User=myuseraccount;Password=mypassword;URL=http://myserver/myOrgRoot;
- On the Physical Schema screen, enter the following information:
- Name: Select from the Drop Down menu.
- Database (Catalog): Enter CData.
- Owner (Schema): If you select a Schema for Microsoft Project, enter the Schema selected, otherwise enter MicrosoftProject.
- Database (Work Catalog): Enter CData.
- Owner (Work Schema): If you select a Schema for Microsoft Project, enter the Schema selected, otherwise enter MicrosoftProject.
- In the opened model click Reverse Engineer to retrieve the metadata for Microsoft Project tables.
Edit and Save Microsoft Project Data
After reverse engineering you can now work with Microsoft Project data in ODI. To edit and save Microsoft Project data, expand the Models accordion in the Designer navigator, right-click a table, and click Data. Click Refresh to pick up any changes to the data. Click Save Changes when you are finished making changes.
Create an ETL Project
Follow the steps below to create an ETL from Microsoft Project. You will load Projects entities into the sample data warehouse included in the ODI Getting Started VM.
Open SQL Developer and connect to your Oracle database. Right-click the node for your database in the Connections pane and click new SQL Worksheet.
Alternatively you can use SQLPlus. From a command prompt enter the following:
sqlplus / as sysdba
- Enter the following query to create a new target table in the sample data warehouse, which is in the ODI_DEMO schema. The following query defines a few columns that match the Projects table in Microsoft Project:
CREATE TABLE ODI_DEMO.TRG_PROJECTS (PROJECTACTUALCOST NUMBER(20,0),ProjectName VARCHAR2(255));
- In ODI expand the Models accordion in the Designer navigator and double-click the Sales Administration node in the ODI_DEMO folder. The model is opened in the Model Editor.
- Click Reverse Engineer. The TRG_PROJECTS table is added to the model.
- Right-click the Mappings node in your project and click New Mapping. Enter a name for the mapping and clear the Create Empty Dataset option. The Mapping Editor is displayed.
- Drag the TRG_PROJECTS table from the Sales Administration model onto the mapping.
- Drag the Projects table from the Microsoft Project model onto the mapping.
- Click the source connector point and drag to the target connector point. The Attribute Matching dialog is displayed. For this example, use the default options. The target expressions are then displayed in the properties for the target columns.
- Open the Physical tab of the Mapping Editor and click PROJECTS_AP in TARGET_GROUP.
- In the PROJECTS_AP properties, select LKM SQL to SQL (Built-In) on the Loading Knowledge Module tab.
You can then run the mapping to load Microsoft Project data into Oracle.